No Acclimation Period
Maple installed without on-site acclimation shrinks in Phoenix’s sub-20% indoor humidity, opening visible gaps between boards.
Scheduled Acclimation
The builder stages a multi-day acclimation period so the maple reaches equilibrium before the first board is fastened.