What does a complete installation include?
Site grading, sub-base compaction, a concrete or asphalt slab, acrylic surface coating, regulation line striping, and net post installation. Depending on the site, drainage work, perimeter fencing, or lighting may also be scoped.
Is concrete or asphalt better for a pickleball court in Phoenix?
Concrete is the more common choice here because it handles Phoenix heat cycles with less thermal movement than asphalt. Asphalt can work if the base thickness and compaction spec are adjusted for the site conditions.
What happens if I skip proper base preparation?
A base laid without correct compaction or drainage slope leads to cracking, standing water, and an uneven surface. Repairs to a failed base cost more than doing the preparation correctly the first time.
Can an existing driveway or tennis court surface be reused?
Sometimes. The builder checks the existing surface for slope, cracks, and whether the area fits the playing zone plus runoff clearance. If the surface is sound and level, it may be resurfaced rather than replaced.
Why does caliche soil matter for a Phoenix court build?
Caliche is a hard, calcium-rich layer common in Phoenix-area soil. It resists compaction and can trap water beneath the slab. The site assessment identifies caliche depth so the sub-base preparation accounts for it before the slab is poured.
How much runoff clearance is needed around the playing area?
The playing area is 20 by 44 feet. A 10-foot runoff clearance on each end is the standard planning target, giving players safe room to move and keeping the surface clear of water after rain.